Civil Engg Work done by Agril Engineers/ CAETians in Odisha.
Before 1995, the Agril Engineers in the state were only executing farm development work, repair of office buildings, garages etc. costing below rupees 1 lakh. During the period of Taradutta Sharma,IAS,Director, Agriculture & Food Production (95-98) the Agril Engineers were compelled to construct go-downs worth Rs. 7 lakh.
During the period of Sri Arabinda Padhi, IAS,Director, Agriculture & Food Production(2007-09) & Er U.P.Singh, Principal Secretary, Agriculture, Office buildings starting from Rs 25 lakh to Rs 4 crores were given to Agril Engineers for execution following the mode of ‘e’ tender process and engagement of contractors starting from B class to Special class. Some of the completed buildings have been inaugurated by the Hon’ble Governor of Odisha, Chief Minister of of Odisha, op Agriculture Minister & different MLAs of the state including the RDC of northern zone. After 2007, the following work worth 101.56 crore have been executed by Agricultural Engineers within a period of two to there years.
Farm Information & Advisory Centre-200nos, estimated cost-60 crore.
Soil Testing Laboratory-14 nos,estimated cost 5.6 crore.
Seed Storage Godown- 17nos, estimated cost 8.5 crore
OSSOPCA Laboratory-3 nos, estimated cost 2.25 crore
OSSOPCA Office-5 nos, Estimated Cost 2.38 crore
Biofertiliser Testing laboratory,Barmunda,BBSR-1no, Estimated Cost 0.46 crore
Community Threshing Floor (20x20)sqm-100 nos,Estimated Cost 3.34 crore.
Community Threshing Floor(30x30)sqm- 110nos,Estimated Cost 7.93 crore
Jute Retting Tank-3nos,Estimated Cost 0.15 crore
Insecticide testing laboratory at Sambalpur-1no,Estimated Cost 0.60 crore.
Fertiliser testing laboratory at Raygada-1no,Estimated Cost 0.20 crore
Renovation of existing building at RITE,Rangeilunda,Mahisapat,Balangir-3nos,Estimated Cost 1.82 crore.
Construction of Officer’s Hostel at IMAGE ,Bhubaneswar-1no,Estimated Cost 3.73 crore.
Construction of new training hall-cum- rest house in MI & WU, Baramunda, BBSR and Renovation of existing building-1no,Estimated Cost 0.60 crore
Construction of Odisha Farm Machinery Research and Development Center and Renovation of Implement Factory-1nos,Estimated Cost 4 crore